Process introduction of Clirik gold separator equipment

1 feeding screening system:

The raw ore is transported by truck to the original mine silo. The original mine silo is equipped with a sieve. The large granular material on the sieve is manually crushed by a hydraulic hammer until it falls into the mine bin. A belt is supplied to the lower discharge port of the mine bin to feed the miner. through
1# tape conveyor is sieved into the circular vibrating screen, the product is sieved into the garbage separation device, and the garbage is manually selected.
3# belt conveyor transported to
4# belt conveyor, under the screen product
2# tape conveyor is fed into the steel structure powder mine.

2 grinding classification system:

The ore in the silo bin is fed to the mining machine via a belt.
4# belt conveyor, fed into the energy-saving ball mill by the belt conveyor, the ball mill discharge is driven by the slurry pump into the cyclone group for grading, the cyclone bottom flow returns to the ball mill and then grinded, and the overflow flows through the impurity removal screen to remove the impurities. Concentrated leaching system.

3 dense leaching system:

The slurry is concentrated by a high-efficiency reforming thickener, and the overflow flows into the circulating pool. The bottom stream is driven into the leaching tank by the rubber pump, and the leaching agent is added at the same time. The pre-dip is carried out by the two leaching tanks, and the activated carbon is adsorbed, and the activated carbon is added to the final leaching. In the tank, it is gradually operated to the front leaching tank according to the regulations. When the activated carbon runs to the third leaching tank and the gold content meets the requirements, the air sifter is mentioned by the air hoist to separate the carbon slurry, and the slurry returns to the leaching tank. Gold charcoal is sent to the desorption electrolysis system.

4 analytical electrolysis system:

The gold-loaded charcoal is washed and removed in the carbon storage tank and then enters the desorption column. The desorbed liquid configured by the desorption liquid tank is fed by the bottom of the desorption column by heating and pressurizing, and the gold cyanide complex in the gold-loaded charcoal is desorbed. After filtering through the filter, it is electrolyzed into the electrolytic cell to obtain gold mud.

5 dosing system:

The carbon powder factory has a large number of dosing points. In order to ensure the continuous accuracy of the dosing, Clirik's patented touch screen computer dosing machine is used to control the dosing of each point, and the compound stirring and lime stirring are provided.

6 dehydration system:

The final tailings of the leaching tank are pumped to the fully automatic chamber filter press through the buffer tank. The filtered water flows into the circulating pool for recycling. The filter cake is transported to the tailings yard by the conveyor, and the truck will be tailings. Shipped to the tailings pond.